[Pacemaker] Pacemaker 1.1.12 cib testing, crm_mon doesn't work
Andrew Beekhof
andrew at beekhof.net
Fri Jun 13 10:41:09 CEST 2014
On 13 Jun 2014, at 5:35 pm, Johan Huysmans <johan.huysmans at inuits.be> wrote:
> Hi,
>
> The PCMK_ipc_buffer was already set to 10000000 (10M).
Try setting that in your environment too (otherwise the CLI tools wont know about the new value).
Or grab a newer libqb which _should_ do the right thing anyway
>
> For testing I increased to buffer to 10000000 (100M), without results.
>
> I decreased the buffer to the default 20480 (20K) as it then shows the suggested value.
> If I leave it running for a couple of minutes I got these suggested values:
> Jun 13 06:33:53 [62206] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (3854984 bytes suggested)
> Jun 13 06:33:54 [62206] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (7709968 bytes suggested)
> Jun 13 06:33:58 [62206] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (15419936 bytes suggested)
> Jun 13 06:35:55 [62206] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (30839872 bytes suggested)
> Jun 13 06:37:56 [62206] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (61679744 bytes suggested)
> Jun 13 07:16:47 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (3952852 bytes suggested)
> Jun 13 07:16:47 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (7905704 bytes suggested)
> Jun 13 07:18:03 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (15811408 bytes suggested)
> Jun 13 07:18:43 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (31622816 bytes suggested)
> Jun 13 07:18:48 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (63245632 bytes suggested)
> Jun 13 07:20:49 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (126491264 bytes suggested)
> Jun 13 07:22:50 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (252982528 bytes suggested)
> Jun 13 07:22:52 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (505965056 bytes suggested)
> Jun 13 07:23:57 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (1011930112 bytes suggested)
> Jun 13 07:24:51 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (2023860224 bytes suggested)
> Jun 13 07:26:52 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (-247246848 bytes suggested)
> Jun 13 07:27:22 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (-494493696 bytes suggested)
> Jun 13 07:29:22 [44112] SRV-5-1 cib: error: crm_ipc_prepare: Could not compress the message into less than the configured ipc limit (20480 bytes).Set PCMK_ipc_buffer to a higher value (-988987392 bytes suggested)
>
> There is definitely something wrong. Is it the printing of the suggested value or is it something else ?
>
> If I check the cib.xml files in /var/lib/pacemaker/cib/ all files are a bit smaller then 300K.
>
> Changing these buffers did not solve my problem not getting results from crm_mon.
>
> Gr.
> Johan
>
>
> On 13-06-14 01:13, Andrew Beekhof wrote:
>> On 12 Jun 2014, at 10:53 pm, Johan Huysmans <johan.huysmans at inuits.be>
>> wrote:
>>
>>
>>> Hi All,
>>>
>>> I deployed Pacemaker 1.1.12-rc2 on our platform to test the cib changes.
>>> This was needed on our setup as it contains 6 nodes, 150 resources and the cib process was using lots of cpu.
>>>
>>> With a limited set of resources (6 nodes, 30 resources) everything worked as expected, including crm_mon.
>>> When loading the complete set of resources we lost the crm_mon functionality on all nodes.
>>> The cluster is running as expected (running all resources) however we don't have any visibility.
>>>
>>> I noticed that operations performing changes did actually work like (crm resource stop <resourcename>),
>>> but crm resource status didn't work (using crmsh-2.0+git46-1.1.x86_64).
>>>
>>> I noticed that /dev/shm/qb-cib_ro* files are created, and lsof shows that they are both opened by crm_mon and cib.
>>>
>>>
>>> When executing "crm_mon -1" I get following messages in /var/log/messages (and /var/log/pacemaker.log)
>>> Jun 12 12:47:38 [8062] SRV-5-1 cib: notice: crm_ipcs_sendv: Response 2 to 0x1810370[17836] (1091618 bytes) failed: Resource temporarily unavailable (-11)
>>> Jun 12 12:47:38 [8062] SRV-5-1 cib: warning: do_local_notify: Sync reply to crm_mon failed: No message of desired type
>>>
>>>
>>> Restarting the pacemaker and cman service of 1 node didn't solve it.
>>>
>>>
>>> What is causing this problem and how can I resolve it ?
>>>
>> Almost certainly you're hitting IPC limits associated with large clusters.
>>
>> You should be able to tune:
>>
>> # PCMK_ipc_buffer=20480
>>
>> In /etc/sysconfig/pacemaker and then restart the cluster.
>>
>> Note also:
>>
>> # For non-systemd based systems, prefix 'export' to each enabled line
>>
>>
>>
>>
>>
>> _______________________________________________
>> Pacemaker mailing list:
>> Pacemaker at oss.clusterlabs.org
>> http://oss.clusterlabs.org/mailman/listinfo/pacemaker
>>
>>
>> Project Home:
>> http://www.clusterlabs.org
>>
>> Getting started:
>> http://www.clusterlabs.org/doc/Cluster_from_Scratch.pdf
>>
>> Bugs:
>> http://bugs.clusterlabs.org
>
> _______________________________________________
> Pacemaker mailing list: Pacemaker at oss.clusterlabs.org
> http://oss.clusterlabs.org/mailman/listinfo/pacemaker
>
> Project Home: http://www.clusterlabs.org
> Getting started: http://www.clusterlabs.org/doc/Cluster_from_Scratch.pdf
> Bugs: http://bugs.clusterlabs.org
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 841 bytes
Desc: Message signed with OpenPGP using GPGMail
URL: <http://oss.clusterlabs.org/pipermail/pacemaker/attachments/20140613/819cf4b2/attachment-0001.sig>
More information about the Pacemaker
mailing list