[Pacemaker] [Problem]The problem of the combination of Pacemaker and corosync1.2.7.
renayama19661014 at ybb.ne.jp
renayama19661014 at ybb.ne.jp
Mon Aug 2 01:17:53 UTC 2010
Hi,
I confirmed movement when corosync1.2.7 combined Pacemaker.
The combination is as follows.
* corosync 1.2.7
* Pacemaker-1-0-74392a28b7f3.tar
* Cluster-Resource-Agents-bfcc4e050a07.tar
* Reusable-Cluster-Components-8286b46c91e3.tar
I confirmed the next movement in two nodes of a virtual machine(RHEL5.5 x84) and the real
machine(RHEL5.5 x64).
The resource arranged nothing.
1) When it started only in corosync, a node do not be hung up.(and when stopped)
2) When I put Pacemaker and corosync together and started, a node do not be hung up.(and when stopped)
Only 20 number of times carried out the confirmation in each environment.(x86 and x64)
Unfortunately the following problem occurred.
* The problem did not happen by the start only for corosync this time.(and when stopped)
Problem 1) By the start of the virtual machine, a virtual machine is sometimes hungup.
Like a former problem, it is used nearly 100% for the CPU.
Problem 2) There was the case that cannot constitute a cluster after start.
Problem 3) There is a case to fail in the start of a cib process and the attrd process.
Jul 30 14:25:46 x3650g attrd: [26258]: ERROR: ais_dispatch: Receiving message body failed: (2) Library
error: Resource temporarily unavailable (11)
Jul 30 14:25:46 x3650g attrd: [26258]: ERROR: ais_dispatch: AIS connection failed
Jul 30 14:25:46 x3650g cib: [26256]: ERROR: ais_dispatch: Receiving message body failed: (2) Library
error: Resource temporarily unavailable (11)
Jul 30 14:25:46 x3650g cib: [26256]: ERROR: ais_dispatch: AIS connection failed
Jul 30 14:25:46 x3650g attrd: [26258]: CRIT: attrd_ais_destroy: Lost connection to OpenAIS service!
Jul 30 14:25:46 x3650g cib: [26256]: ERROR: cib_ais_destroy: AIS connection terminated
Jul 30 14:25:46 x3650g attrd: [26258]: info: main: Exiting...
Jul 30 14:25:46 x3650g attrd: [26258]: ERROR: attrd_cib_connection_destroy: Connection to the CIB
terminated...
Jul 30 14:25:46 x3650g stonithd: [26255]: ERROR: ais_dispatch: Receiving message body failed: (2)
Library error: Success (0)
Jul 30 14:25:46 x3650g stonithd: [26255]: ERROR: ais_dispatch
Can this problem be settled in Pacemaker1.0 and corosync1.2.7?
I know that a revision to replace communication with CPG in structure of new Pacemaker begins.
When we combine corosync and use it, should we wait for a revision of CPG to be over?
(Should we wait for Pacemaker1.1 system?)
Because log is big, I contact it again after registering this problem with bugzilla.
Best Regards,
Hideo Yamauchi.
More information about the Pacemaker
mailing list